Difference between revisions of "AA3 Pipeline"
(Created page with "This page is about the map Pipeline imported from AA3. ==Gold Team== ; Situation : A central pump station is being reactivated for use by the local government. ; Mission...") |
(→Gold Team) |
||
Line 4: | Line 4: | ||
; Situation | ; Situation | ||
− | + | A central pump station is being reactivated for use by the local government. | |
; Mission | ; Mission | ||
Line 11: | Line 11: | ||
; ROE | ; ROE | ||
− | + | Rules of Engagement published 12MAY05 are in effect. Use appropriate force against | |
positively identified enemy combatants only. Minimize damage to local infrastructure. | positively identified enemy combatants only. Minimize damage to local infrastructure. | ||
Be advised large civilian presence in contested area. | Be advised large civilian presence in contested area. | ||
; Enemy | ; Enemy | ||
− | + | 23rd Mechanized Infantry Division, N.M.E. North are active in the region | |
surrounding Hill 8395 and are threatening a facility essential to the RDO. | surrounding Hill 8395 and are threatening a facility essential to the RDO. | ||
; Troops | ; Troops | ||
− | + | 82nd Airborne, Delta Company 2/325 AIR will engage enemy mechanized infantry | |
at Hill 8395 at grid ZF269883. 82nd Airborne, Bravo Company 2/325 AIR will defend the | at Hill 8395 at grid ZF269883. 82nd Airborne, Bravo Company 2/325 AIR will defend the | ||
facility located at ZD309784. | facility located at ZD309784. | ||
; Terrain | ; Terrain | ||
− | + | Facility consisting of three structures: the pump station, the exterior storage | |
− | tanks and a 1-story out-building housing the emergency shut-ooff valve. | + | tanks and a 1-story out-building housing the emergency shut-ooff valve. |
− | + | ||
==Black Team== | ==Black Team== |
Revision as of 08:37, 27 March 2015
This page is about the map Pipeline imported from AA3.
Gold Team
- Situation
A central pump station is being reactivated for use by the local government.
- Mission
- Secure the main control panel or disable all three main valves to prevent the
enemy from sabotaging the facility's operation.
- ROE
Rules of Engagement published 12MAY05 are in effect. Use appropriate force against positively identified enemy combatants only. Minimize damage to local infrastructure. Be advised large civilian presence in contested area.
- Enemy
23rd Mechanized Infantry Division, N.M.E. North are active in the region surrounding Hill 8395 and are threatening a facility essential to the RDO.
- Troops
82nd Airborne, Delta Company 2/325 AIR will engage enemy mechanized infantry at Hill 8395 at grid ZF269883. 82nd Airborne, Bravo Company 2/325 AIR will defend the facility located at ZD309784.
- Terrain
Facility consisting of three structures: the pump station, the exterior storage tanks and a 1-story out-building housing the emergency shut-ooff valve.
Black Team
- Situation
- A central pump station is being reactivated for use by the local government.
- Mission
- Defend the facility and keep if fully operational. Prevent the main control panel
from beeing compromised.
- ROE
- Rules of Engagement published 12MAY05 are in effect. Use appropriate force against
positively identified enemy combatants only. Minimize damage to local infrastructure. Be advised large civilian presence in contested area.
- Enemy
- 23rd Mechanized Infantry Division, N.M.E. North are active in the region
surrounding Hill 8395 and are threatening a facility essential to the RDO.
- Troops
- 82nd Airborne, Delta Company 2/325 AIR will engage enemy mechanized infantry at
Hill 8395 at grid ZF269883. 82nd Airborne, Bravo Company 2/325 AIR will defend the facility located at ZD309784.
- Terrain
- Facility consisting of three structures: the pump station, the exterior storage
tanks and a 1-story out-building housing the emergency shut-ooff valve.