AA3 Pipeline

From AAO25, the home of 25Assist for America's Army
Revision as of 19:58, 29 March 2015 by Teddy (Talk | contribs)

Jump to: navigation, search
AA3 Pipeline

This page is about the map Pipeline imported from AA3.

Gold Team

Situation

A central pump station is being reactivated for use by the local government.

Mission
Secure the main control panel or disable all three main valves to prevent the

enemy from sabotaging the facility's operation.

ROE

Rules of Engagement published 12MAY05 are in effect. Use appropriate force against positively identified enemy combatants only. Minimize damage to local infrastructure. Be advised large civilian presence in contested area.

Enemy

23rd Mechanized Infantry Division, N.M.E. North are active in the region surrounding Hill 8395 and are threatening a facility essential to the RDO.

Troops

82nd Airborne, Delta Company 2/325 AIR will engage enemy mechanized infantry at Hill 8395 at grid ZF269883. 82nd Airborne, Bravo Company 2/325 AIR will defend the facility located at ZD309784.

Terrain

Facility consisting of three structures: the pump station, the exterior storage tanks and a 1-story out-building housing the emergency shut-ooff valve.

Black Team

Situation

A central pump station is being reactivated for use by the local government.

Mission

Defend the facility and keep if fully operational. Prevent the main control panel from beeing compromised.

ROE

Rules of Engagement published 12MAY05 are in effect. Use appropriate force against positively identified enemy combatants only. Minimize damage to local infrastructure. Be advised large civilian presence in contested area.

Enemy

23rd Mechanized Infantry Division, N.M.E. North are active in the region surrounding Hill 8395 and are threatening a facility essential to the RDO.

Troops

82nd Airborne, Delta Company 2/325 AIR will engage enemy mechanized infantry at Hill 8395 at grid ZF269883. 82nd Airborne, Bravo Company 2/325 AIR will defend the facility located at ZD309784.

Terrain

Facility consisting of three structures: the pump station, the exterior storage tanks and a 1-story out-building housing the emergency shut-ooff valve.